PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing copper piping at the 4th floor Facing North.jpg Installing electrical split wire above the ceiling at the 2nd floor Facing West.jpg Installing Sprinkler main raiser at the 4th floor Facing North-East.jpg Interior metal framing at the 4th floor Facing West.jpg Metal studs at the 2nd floor Facing West.jpg Stair -3 at the 3rd floor Facing North.jpg Welding Stair -1 stairs Facing South.jpg Block work at the lower Facing North.jpg Installing the curtain wall mullions at the South Elevation.jpg
Previous pageNext page Metal studs at the 2nd floor Facing West
Metal studs at the 2nd floor Facing West